Right side view wearing a peeling Rawson Materials decal exiting the north (right) end of the Railroad Ave 2-track grade crossing in the Providence & Worcester Railroad yard at Plainfield, CT. Built 12/1975. 2580 cu ft cap. Length 44' 2". |
Date:
8/7/2018 |
Location:
Plainfield, CT Map  |
Views:
27 |
Collection Of:

Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton Haeseler
|
a.jpg) |
Picture Categories: RollingStock,Yard,Signal,Track,Action |
This picture is part of album: TRIX equipment in CT |